Arquitetura, Industria e Projetos · 100% scholarship active

Professional training in Last Planner System with certificate

Structured Last Planner System learning path with a schedule, practical exercises and a verifiable digital certificate.

  • 240 certified hours
  • Lifetime access
  • 3 professional documents included
  • Public registry with QR
100% scholarship activeR$ 17,90 one-time enrollment feeClaim scholarship

What you will learn

  • Understand the fundamentals of Last Planner System and its key terminology
  • Identify when and how to apply Last Planner System in real study, work or personal-project situations
  • Follow an organized schedule to progress consistently
  • Practice with guided exercises, checklists and case studies
  • Recognize common mistakes and quality criteria before moving on
  • Build a continuity plan after completing the path
  • Use the content responsibly, respecting technical, ethical and professional boundaries
  • Finish the course with Certificadora Global's verifiable digital certificate

Course content

6 modules · 240 certified hours · study at your own pace

1Module 1 — Starting-point diagnosis

Conceptual base of Last Planner System, essential vocabulary, course goals and study criteria.

2Module 2 — Essential fundamentals

The pillars of Last Planner System explained in logical sequence, with commented examples.

3Module 3 — Guided practice

Applied Last Planner System exercises, step by step, with verification checklists.

4Module 4 — Common mistakes and quality criteria

What prevents rework: frequent pitfalls and how to assess your own progress.

5Module 5 — Application in real context

Case studies and practical scenarios to consolidate Last Planner System in day-to-day work.

6Module 6 — Review and certification

Structured review, final assessment and issuance of the verifiable digital certificate.

Materials included in the scholarship

Every Certificadora Global course includes the complete study kit — no extra purchases inside the course.

  • Digital book

    The full course ebook, yours forever

  • Study guide and exercises

    Support material with checklists and case studies

  • Audio lessons

    Study on the go, in MP3 format

  • Mind map

    The whole course on a single page

Three documents: completion, professional title and international registry

Every Certificadora Global certificate has a public registration number, a QR Code and a verification page. Anyone can confirm its authenticity in seconds — no sign-up and no need to contact us.

Certificate of CompletionIssued upon completing the modules
Professional Title CertificateProfessional title with public verification
International Professional RegistryWith Certificadora Global public registration

Black Badge for the professional title

Once you complete the professional track, you can issue the black badge with your photo, title and QR Code — the credential many students use in their bio, portfolio and e-mail signature.

Study anywhere, with your progress saved

The student platform works on your phone like an app: lessons, downloadable materials, synced progress and your certificate unlocked on completion — all in one place, forever.

  • Offline lessons and study guides
  • Automatic progress per module
  • Issue your certificate right from the app

Frequently asked questions

What will I learn in the Online Last Planner System Course?

You study the fundamentals of Last Planner System, practical examples, quality criteria, common mistakes and a continuity plan to keep progressing after the course.

Is the certificate valid and verifiable?

Yes. Upon completion you receive a 240-hour digital certificate with public registration at Certificadora Global, verifiable at any time via the QR Code printed on the document.

How much does it cost and how does enrollment work?

The one-time enrollment costs R$ 39.90 with the 100% scholarship active, and grants lifetime access to the content — no monthly fees.

Do I need prior experience?

No. The Last Planner System path starts at beginner level, with an organized schedule, and gradually advances to intermediate and advanced topics.

How long does it take to finish?

Access is lifetime and the pace is yours. The certified course load is 240 hours, and you can take the final assessment whenever you feel ready.